:: Home :: Contact Us :: Our Website :: Our YouTube ::

Monday, December 7, 2009

Replacing Front Door

1. Removing existing front door: [+]
2. Cutting the existing frame to make the new door-jamb fit: [+]
3. Cleaning the block frame at one side: [+]
4. Cutting the concrete bottom part to make the new threshold fit; filling out the holes and gaps: [+][+]
5. Applying lines of caulk (silicon) to make the bottom part air-tight and water-proof; also for installation of threshold: [+]
6. installing door-jamb and door; applying spray foam in the gapes: [+][+]
7. Installing trims, painting, installing new hardware:


Time of the project: one full day.
Cost: for this certain door and condition, labour and matterial together $750.

No comments:

Post a Comment

:: Majic Construction © 2006 - 2010. All rights reserved. ::