:: Home :: Contact Us :: Our Website :: Our YouTube ::

Friday, November 6, 2009

Asphalt

We changed the asphalt on a driveway shared between two neighbours. We shaved the existing asphalt, checked the concrete slaps underneath, fixed some needed parts of the base, applied "bonding agent", put 2 to 4 inches hot asphalt, made the slopes and grading... and finally, got our cheques!
The weather was cold, specially in the point of shadow. It was the last job of the week.

No comments:

Post a Comment

:: Majic Construction © 2006 - 2010. All rights reserved. ::